A wind turbine rises to its resting place Monday at the Farmington wastewater treatment plant. A winch was used to pull up the 33-foot-tall pole, with the tip of the blades extending it to 41 feet. The turbine weighs 635 pounds and was placed on a 4-foot-deep slab of concrete.
Turbine goes up
Posted
1 min read
Loading...
You are able to gift 5 more articles this month.
Anyone can access the link you share with no account required. Learn more.
Article link sent!
An error has occurred. Please try again.
With a Lewiston Sun Journal subscription, you can gift 5 articles each month.
It looks like you do not have any active subscriptions. To get one, go to the subscriptions page.
With a Lewiston Sun Journal subscription, you can gift 5 articles each month.
Share this:
- Click to share on Facebook (Opens in new window) Facebook
- Click to share on X (Opens in new window) X
- Click to share on LinkedIn (Opens in new window) LinkedIn
- Click to share on Reddit (Opens in new window) Reddit
- Click to share on Nextdoor (Opens in new window) Nextdoor
- Click to share on Bluesky (Opens in new window) Bluesky
- Click to email a link to a friend (Opens in new window) Email
Comments are no longer available on this story