You have a registered email address and password on pressherald.com, but we are unable to locate a paid subscription attached to these credentials. Please verify your current subsription or subscribe.
A Farmington town crew and the University of Maine are working jointly to install a new section of sidewalk on High Street from the Student Center parking lot to South Street. The crew leveled the 5-foot space to prepare for paving next week by Bruce Manzer Inc. Working are Jim Kiernan, Glen Meisner and Ted Collins shoveling, Ron Jalbert in the backhoe and Jeff Dunham directing traffic in the background.
A Farmington town crew and the University of Maine are working jointly to install a new section of sidewalk on High Street from the Student Center parking lot to South Street. The crew leveled the 5-foot space to prepare for paving next week by Bruce Manzer Inc. Working are Jim Kiernan, Glen Meisner and Ted Collins shoveling, Ron Jalbert in the backhoe and Jeff Dunham directing traffic in the background.
Comments are no longer available on this story