For reconstruction of routes 4 and 27 in Farmington
Miles of sidewalk: 1.2
Total length of project: 2.05 miles
Total cost: $2.97 million
Number of workers: between 20 and 75
Width of road currently: 22 to 24 feet
Width of road after project: 40 feet (two 12-foot travel lanes, two 8-foot shoulders)
Retaining walls to be built: 5
Amount of dirt excavated and moved: 50,000 cubic yards
Amount of ledge to be blasted out: 1,000 cubic yards
Amount of gravel laid down: 55,000 cubic yards
Amount of drainage pipe put in: 3.02 miles
Source: Contractor Kevin Vining from E.L.Vining and Sons Inc.
Send questions/comments to the editors.
Success. Please wait for the page to reload. If the page does not reload within 5 seconds, please refresh the page.
Enter your email and password to access comments.
Hi, to comment on stories you must . This profile is in addition to your subscription and website login.
Already have a commenting profile? .
Invalid username/password.
Please check your email to confirm and complete your registration.
Only subscribers are eligible to post comments. Please subscribe or login first for digital access. Here’s why.
Use the form below to reset your password. When you've submitted your account email, we will send an email with a reset code.