CHESTERVILLE — The Chesterville Board of Selectmen is scheduled to meet at 6:30 p.m. Monday at the Town Office to discuss the redesign for the Sandy River Road project.
The project includes replacing two culverts with a larger-capacity, open-bottom structure spanning the stream.
The structure is designed to handle 100-year flood peak flows. It is a corrugated, aluminum box culvert with a span of more than 21 feet.
The meeting might also include a visit to the site, according to town officials.
Supporting Sponsor for Franklin Journal, Livermore Falls Advertiser, Rangeley Highlander and Rumford Falls Times.
Keeping communities informed by supporting local news. franklinsavings.bank
Comments are no longer available on this story