NORWAY — A footbridge to span Pennesseewassee Stream from Water Street to Main Street is expected to be on site in mid-August.
Town Manager David Holt said the prefabricated bridge is due to arrive Aug. 19 and will be placed on the foundation of a previous bridge.
“It weighs a lot,” Holt said. A crane will set it in place.
Officials have said the bridge will improve access to the Matolcsy Art Center and the Gingerbread House, both on Main Street. Holt said the bridge comes with certification that it is safe.
Residents agreed at the 2012 annual town meeting to spend $20,000 from the Community and Economic Development reserve for the bridge but Holt said it wasn’t enough money so the project was held up.
In March, two anonymous donors gave the town as much of $10,000 to complete the purchase and installation of the footbridge.
Under a proposed master plan in 2004, residents wanted a footbridge across the Pennesseewassee Stream to link the former Cummings dowel mill property to Main Street. That plan never came to fruition.
- Pine Tree Engineering will oversee installation of this style of prefabricated bridge over Pennesseewassee Stream from Water Street to Main Street in Norway next month.
Success. Please wait for the page to reload. If the page does not reload within 5 seconds, please refresh the page.
Enter your email and password to access comments.
Invalid username/password.
Please check your email to confirm and complete your registration.
Only subscribers are eligible to post comments. Please subscribe or login first for digital access. Here’s why.
Use the form below to reset your password. When you've submitted your account email, we will send an email with a reset code.
-
Sports
Sports on TV: Saturday, January 28, 2023
-
Connections
Plymouth State University names locals to dean’s list
-
Connections
Gray, Bridgton students make Castleton University president’s list
-
Encore
Copeland to celebrate Grammy-nominated album with Waterville concert
-
Obituaries
Obituary: Harold A. Spear